{"id":199,"date":"2021-07-28T15:36:04","date_gmt":"2021-07-28T11:36:04","guid":{"rendered":"https:\/\/i-n.az\/site\/?page_id=199"},"modified":"2021-09-14T13:16:09","modified_gmt":"2021-09-14T09:16:09","slug":"our-services","status":"publish","type":"page","link":"https:\/\/i-n.az\/en\/our-services\/","title":{"rendered":"Our Services"},"content":{"rendered":"<p><\/p>\n<ol>\n<li><strong>Earth works;<\/strong><\/li>\n<li><strong>Bulk concrete and concrete construction erection, precast concrete and concrete construction assembly;<\/strong><\/li>\n<li><strong>Roofing works:<\/strong>\n<ul>\n<li>roll materials roofing;<\/li>\n<li>polymer and bitumen-emulsion compound roofing;<\/li>\n<li>single-piece materilas roofing;<\/li>\n<li>metalware details roofing;<\/li>\n<\/ul>\n<\/li>\n<li><strong>Lighweight security constructions rigging:<\/strong>\n<ul>\n<li>metal works;<\/li>\n<\/ul>\n<\/li>\n<li><strong>Indoor engineering system and equipment mounting jobs:<\/strong>\n<ul>\n<li>Technical pipe, water and drainage lines, equipment, count and control facilities installation;<\/li>\n<\/ul>\n<\/li>\n<li><strong>Sea and river hydraulic facilities hydroengineering works at open and closed water areas:<\/strong>\n<ul>\n<li>barrage (earth dam) construction;<\/li>\n<li>ports construction;<\/li>\n<\/ul>\n<\/li>\n<li><strong>Road building:<\/strong>\n<ul>\n<li>\u0130 and \u0130\u0130 category highways;<\/li>\n<li>\u0130\u0130\u0130, \u0130V and V category roads;<\/li>\n<\/ul>\n<\/li>\n<li><strong>Industrial, civil and public objects construction:<\/strong>\n<ul>\n<li>Tribune type open sporting building;<\/li>\n<li>up to 5000 (five thousand) humans and more content;<\/li>\n<\/ul>\n<\/li>\n<li><strong>Special equipment build and assembly:<\/strong>\n<ul>\n<li>pipeline;<\/li>\n<li>magistral;<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Earth works; Bulk concrete and concrete construction erection, precast concrete and concrete construction assembly; Roofing works: roll materials roofing; polymer and bitumen-emulsion compound roofing; single-piece materilas roofing; metalware details roofing; Lighweight security constructions rigging: metal works; Indoor engineering system and equipment mounting jobs: Technical pipe, water and drainage lines, equipment, count and control facilities installation; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-199","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/pages\/199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/comments?post=199"}],"version-history":[{"count":4,"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/pages\/199\/revisions"}],"predecessor-version":[{"id":590,"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/pages\/199\/revisions\/590"}],"wp:attachment":[{"href":"https:\/\/i-n.az\/en\/wp-json\/wp\/v2\/media?parent=199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}